Multi-Strand Concrete Prestressed Permanent Anchorage

Product Details
Customization: Available
After-sales Service: Contact with E-Mail, Video, What′s APP
Warranty: One Year
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Gold Member Since 2018

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
In-stock Capacity
The supplier has In-stock capacity
Fast Delivery
The supplier can deliver the goods within 15 days
R&D Capabilities
The supplier has 1 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (12)
  • Multi-Strand Concrete Prestressed Permanent Anchorage
  • Multi-Strand Concrete Prestressed Permanent Anchorage
  • Multi-Strand Concrete Prestressed Permanent Anchorage
  • Multi-Strand Concrete Prestressed Permanent Anchorage
  • Multi-Strand Concrete Prestressed Permanent Anchorage
  • Multi-Strand Concrete Prestressed Permanent Anchorage
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Installation Instructions
  • Company Profile
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
ZT
Certification
CCC, CE
Surface Treatment
No
Technics
Moulding Plastic
Material
Plastic
Type
Insulating Tape
PC Strand
1-15holes
Anchorage Shape
Round or Flat
Dimension
for 12.7mm, 12.9mm, 15.1mm, 15.9mm. PC Strand
Wedge Form
2 Chip or 3 Chips
Transport Package
Wooden Box
Specification
steel
Trademark
ZHONGTUO
Origin
China
Production Capacity
10000pieces/Month

Packaging & Delivery

Package Size
100.00cm * 75.00cm * 80.00cm
Package Gross Weight
50.000kg

Product Description

Product Description

 


General anchorage construction and installation method
The general anchorage construction and installation method are to put a small number of explosives at the bottom of the hole, expand it into a spherical shape after several anchorage constructions and installations, and finally put the explosives into the anchorage construction and installation. Compared with the hole anchorage construction and installation method, this method has the advantages of good anchorage construction and installation effect, high work efficiency, fast progress, and low consumption of explosives. This method is often used in the construction and installation of short pile anchors for shallow foundations.
 
Product Parameters

 


Technical data of YJM13 Anchorage
Specification Anchor Head Bearing Plate Duct Spiral Reinforcement Stressing Jack
ΦA B Square Round ΦE(ID) ΦF H ΦG N
C*D ΦC*D
YJM13-1 38 40 80×10 - 35 80 30 6 3 QYC270
YJM13-2 76 42 115×80 120×80 45 120 40 8 3 YDC1100
YJM13-3 83 42 120×80 130×80 50 120 40 10 3 YDC1100
YJM13-4 87 42 130×87 135×85 50 135 50 10 3 YDC1100
YJM13-5 97 42 140×92 140×100 55 140 50 10 4 YDC1100
YJM13-6 107 45 150×97 150×125 60 160 50 12 4 YDC1100
YJM13-7 107 45 150×97 150×125 60 160 50 12 4 YDC1100
YJM13-8 117 45 165×115 165×135 60 170 50 12 4 YDC1500
YJM13-9 127 48 175×125 175×140 70 180 50 12 4 YDC1500
YJM13-10 136 48 180×130 180×150 80 200 50 14 4 YDC2500
YJM13-11 138 50 180×130 180×150 80 200 50 14 4 YDC2500
YJM13-12 143 50 190×140 190×150 80 210 50 14 5 YDC2500
YJM13-13 147 53 190×140 190×150 80 210 50 14 5 YDC2500
YJM13-14 153 53 195×150 200×160 80 220 50 14 5 YDC2500
YJM13-15 157 55 195×150 200×160 90 220 50 14 5 YDC2500
YJM13-16 167 55 210×160 210×185 90 240 60 16 6 YDC2500
YJM13-17 172 58 220×175 235×185 90 240 60 16 6 YDC3500
YJM13-18 176 58 235×175 235×185 90 260 60 16 6 YDC3500
YJM13-19 176 58 235×175 235×185 90 260 60 16 6 YDC3500
YJM13-20 196 60 270×185 260×200 90 270 60 16 6 YDC3500
YJM13-21 196 63 270×185 260×200 90 270 60 16 6 YDC3500
YJM13-22 196 65 270×185 260×200 90 270 60 18 6 YDC3500
YJM13-23 206 65 295×245 275×260 100 280 60 18 6 YDC4000
YJM13-24 206 68 295×245 275×260 100 280 60 18 6 YDC4000
YJM13-25 216 68 300×260 275×290 100 290 60 18 6 YDC4000
Technical data of YJM15 Anchorage
Specification Anchor Head Bearing Plate Duct Spiral Reinforcement Stressing Jack
ΦA B Square Round ΦE
(ID)
ΦF H ΦG N
C×D ΦC×D
YJM15-1 43 46 80×12 80×20 35 80 30 8 4 QYC270
YJM15-2 83 48 130×85 135×80 50 120 40 10 4 YDC6500
YJM15-3 87 48 130×87 135×85 50 120 40 10 4 YDC650
YJM15-4 97 48 140×92 140×100 50 140 50 10 4 YDC1100
YJM15-5 107 48 150×97 150×120 55 150 50 10 4 YDC1100
YJM15-6 122 50 165×115 165×135 70 170 50 12 4 YDC1500
YJM15-7 122 50 175×125 175×135 70 170 50 12 4 YDC1500
YJM15-8 137 53 180×130 180×150 80 190 50 12 4 YDC2500
YJM15-9 147 53 190×140 190×150 80 200 50 12 4 YDC2500
YJM15-10 157 53 195×150 210×160 90 210 60 14 4 YDC2500
YJM15-11 157 55 210×160 210×160 90 210 60 14 4 YDC2500
YJM15-12 167 55 210×160 210×185 90 230 60 14 4 YDC2500
YJM15-13 177 55 220×175 210×185 90 230 60 14 4 YDC3500
YJM15-14 177 58 225×175 235×185 90 240 60 14 4 YDC3500
YJM15-15 187 60 235×175 235×185 90 260 60 16 5 YDC3500
YJM15-16 187 60 240×175 235×185 90 260 60 16 5 YDC3500
YJM15-17 197 63 250×185 265×200 100 280 60 16 5 YDC4000
YJM15-18 197 63 270×185 265×200 100 280 60 16 5 YDC4000
YJM15-19 197 63 270×185 265×200 100 280 60 16 5 YDC4000
YJM15-20 217 68 295×245 285×260 120 290 60 16 5 YDC5000
YJM15-21 217 70 295×245 285×260 120 290 60 16 5 YDC5000
YJM15-22 217 70 295×245 285×260 120 290 60 18 5 YDC5000
YJM15-23 237 73 310×260 320×260 120 320 60 18 5 YDC5000
YJM15-24 237 75 310×260 320×260 120 320 60 18 5 YDC5000
YJM15-25 237 78 310×300 320×300 120 330 70 18 5 YDC6500

 

Installation Instructions

 


1. The anchors should be kept properly, and there should be no rust, water, and other sundries in use.
2. Apply lubricant on the outer surface of the tool clip and the inner surface of the taper hole of the anchor plate before use, and often remove the debris on the surface of the clip.
3. Safety measures should be taken during tensioning, and no one can stand after the tensioning jack.
4. The anchor system should be used together and cannot be mixed with other systems.

Multi-Strand Concrete Prestressed Permanent Anchorage

Multi-Strand Concrete Prestressed Permanent Anchorage
Company Profile

 


Shaanxi Zhongtuo Mining Equipment Company was founded in 2005 in Xi'an, Shaanxi Province, It is a foreign trade company specializing in the research, development, and sales of machinery and equipment in the fields of mining, bridges, pavements, and tunnels.
With the improvement of high-quality products and good services, our products are trusted and appreciated by customers from all over the world. Currently, our customers are all over Russia, Thailand, Romania, Bulgaria, Albania, Colombia, Brazil, Peru, Uruguay, Saudi Arabia, Kuwait, United Arab Emirates, Oman, Turkey, Israel, Kazakhstan, India, and many other countries.
Multi-Strand Concrete Prestressed Permanent Anchorage

About Certifications
Multi-Strand Concrete Prestressed Permanent Anchorage
Packaging & Shipping

 


Multi-Strand Concrete Prestressed Permanent Anchorage
Multi-Strand Concrete Prestressed Permanent Anchorage
FAQ

 


Q1: Whether the rig is used for rock holes or soil holes?
A1: Equipped with different drill bits according to the application object. Rock drilling rigs are equipped with round steel drill impact hammers and rock drill bits. The soil drilling rigs require a twist drill pipe and a three-blade drill bit.
 
Q2: How much tonnage can a bridge jack lift??
A2:  The range is from 50 to 1000 tons, depending on the application needs we have the right choice for you.       

Q3: How many meters is the connection between the jack and the oil pump?

A3: The factory standard is two meters. If you need longer, we will make it for you.
                                                                                                                     

Q4: What is the difference between the hydraulic oil pump?
A4: For the tension jack, it is a 50 MPa 3 kW oil pump and a 60 MPa 4 kW oil pump.

Q5: What kind of packages does a set of anchors have?
A5: Anchor ring, clip, anchor pad, spiral rib.
 
Q6: Which payment term can you accept?
A6: 100% T/T( Decide according to actual situation)

Q7: How long is the machine warranty?

A7: One year for the machine and provide technical support according to your needs.

Q8: How long will it take to arrange production?
A8: we can deliver the normal goods within 7-15 days. Other nonstandard electrical items we will deliver within 25-30 days.
 
Q9: Which trade term can you accept?
A9: Available trade terms: FOB, CIF, CFR, EXW, etc.

Q10: Do you provide samples? Is it free or extra?
A10: Yes, we could offer you the sample machine. But it's not free. You need to pay for the sample and the cost of the freight.

Q11: What are your terms of payment?
A11: We accept T/T, Western Union, Money Gram, Paypal, L/C, etc.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now