Customization: | Available |
---|---|
After-sales Service: | Video Communication |
Warranty: | One Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The ZTQ100 drilling rig is based on the ZTD pneumatic submersible drilling rig of our company. The design of the power source is changed and the function is identical with that of the ZTD pneumatic drill. The auxiliary equipment that provides the power is even lighter. It is easier to move and transfer. Where there is a power supply, only a 7m / min electric air compressor is needed. Even if there is no power supply, a 15KW generator can be added to meet the single machine operation. It is convenient for the equipment to enter the field, and the motor is less worn and maintained than the wind motor, so it is a light and economical model.
The DTH rock drilling rig is to make the impactor dive into the hole during the rock drilling process to reduce the energy loss caused by the impact energy transmitted by the drill rod, thereby reducing the impact of the hole depth on the rock drilling efficiency.
Model |
ZTD70 |
ZTQ70 |
ZTD100 |
ZTQ100 | |
Drilling Diameter |
50-90mm |
50-90mm |
90-130mm |
90-130mm | |
Drilling Depth |
≤15m |
≤15m |
≤25m |
≤25m | |
Working Pressure |
0.5-0.7Mp |
0.5-0.7Mp | 0.5-1Mp | 0.5-1Mp | |
Rotation Speed |
110r/m |
110r/m |
110r/m |
110-160r/m | |
Drilling Pipe |
Diameter |
42mm |
42mm |
50-60mm |
50-60mm |
Length |
1025mm |
1025mm | 1025mm | 1025mm | |
Size |
1740*260*420mm |
1740*260*420mm |
2280*400*550mm |
2280*380*550mm |
1. Advanced materials technology and optimized design give you high productivity, reliability, and lower operating costs.
2. With gas-electric linkagey, you receive lower fuel consumption.
3. In-house and industry-leading carbide selection ensure the best quality tools.
1. Before starting work, carefully check whether the gas and water pipelines are firmly connected and whether there is any leakage of air or water.